LAKE ZURICH
HIGH SCHOOL
Energy Solutions International lit the gymnasium at Lake Zurich High School in Illinois using the ME Series, click the button below to read about the project!
LIFE TIME FITNESS
ESI designed 26 custom skus to upgrade or retrofit every Life Time Fitness location in the U.S. Ramping up production, we shipped one location per day for 100 days to meet the timeline of the project.
LIFE TIME FITNESS
ESI designed 26 custom skus to upgrade or retrofit every Life Time Fitness location in the U.S. Ramping up production, we shipped one location per day for 100 days to meet the timeline of the project.
TWIN CITIES
PARKING RAMP
Energy Solutions International replaced an aging LED system with our new GA Series Parking Garage Vapor Tight. Though replacing an existing LED system, ESI was able to reduce energy consumption while increasing light levels and avoiding dark zones!
KINNELON HIGH SCHOOL
In response to national endorsements to enact measures to reduce the spread of SARS-CoV-2 and improve indoor air quality across high-traffic facilities including school buildings, Kinnelon High School utilized their ESSER II funding to implement automated disinfection via hybrid germicidal fixtures.